Raising the height of a manufacturing silo whilst the factory worked below 24 hours a day. Works included steelwork and cladding.
1. Existing Silo to be raised by 4 metres.
2. Scaffold with removeable temporary roof.
3. Romove scaffold roof.
4. Remove existing steel structure
5. Lift structure into place.
6. Re-fix temporary scaffold roof to clad
and roof